SolarReserve Flips the Switch on South African Solar Project

Joanna Schroeder

Jasper Solar Power ProjectSolarReserve has flipped the switch on what they call the largest solar project in South Africa. The 96 MW Jasper solar power project completed construction two months early and is producing at full capacity. The solar farm is located in South Africa’s Northern Cape in a solar park that also includes the 75 MW Lesedi solar power project which came online in May, and the proposed 100 MW Redstone concentrated solar thermal power (CSP) plant featuring SolarReserve’s CSP technology with integrated energy storage.

As part of the South African Renewable Energy Independent Power Producer Procurement Program (REIPPPP), the project will set aside a percentage of total project revenues for Enterprise Development and Socio-Economic Development for the benefit of the local communities.

“In addition to helping South Africa meet its critical electricity needs, the Jasper Project will bring long lasting economic benefits to the region,” said SolarReserve’s CEO Kevin Smith. “We look forward to continuing this positive momentum and bringing value to South Africa through collaboration on further projects, including our upcoming CSP projects that will provide South Africa with clean, reliable and non-intermittent electricity, day and night.”

With over 325,000 PV modules, the Jasper Project will deliver 180,000 megawatt-hours of renewable electricity annually for South Africa residents – enough to power up to 80,000 households through a 20-year power purchase agreement with Eskom, the South African power utility company. Selected by the South Africa Department of Energy (DOE) in the second round of bids under the REIPPPP, the project also marked Google’s first renewable energy investment in Africa.

Electricity, Energy Storage, International, Renewable Energy, Solar