Green Power EMC, the renewable energy supplier for 38 Georgia Electric Membership Corporations (EMCs), has reached an agreement to purchase the full output of a new 20 megawatt (MW) solar project planned for construction in Hazlehurst, Georgia. The solar farm will cover nearly 135 acres, and feature 87,000 ground-mounted solar modules.
Under an agreement with owner-operator Silicon Ranch Corporation, Green Power EMC will receive all the energy produced by the solar project over a 25-year period. Construction is scheduled to begin this year, and the facility will be ready to produce electricity in late 2015.
Jeff Pratt, president of Green Power EMC, said the Hazlehurst project is the result of a request for proposals issued in late 2013 to add more solar energy to Green Power EMC’s portfolio. The company already purchases the output of two solar projects, a 115 kilowatt (kW) rooftop array near Athens, Ga. and a 150 kW ground-mounted array near Warner Robins, Ga. He said the project will nearly double the total renewable capacity of Green Power EMC – from the current 32 MW to about 52 MW.
“This is a major solar power addition, not only to our portfolio but also to the state of Georgia,” said Pratt. “The project moves us further down the road to becoming a much more sustainable state.” According to Pratt, the 20 MW project will produce enough electricity to serve about 3,000 EMC households.
Matt Kisber, president of Silicon Ranch Corporation, who also owns and operates Georgia’s largest solar farm in Social Circle, Georgia, said, “We are excited about the opportunity to partner with Green Power EMC and their members in deploying their first, large-scale solar array. I commend the leadership and membership of Green Power EMC for creating this initiative to provide competitively priced, renewable power solar generation to their Georgia membership.”