Florida Waste to Biofuel Plant Progress

Cindy Zimmerman

A Florida company has announced today that it is three permits closer to opening the BioEnergy Center, the first commercial waste to energy facility in the US.

INEOS Bio’s first commercial project in the United States has secured key permits to build its waste to bioenergy facility in Indian River County, Florida.

The BioEnergy Center will be developed entirely within the existing footprint of a former agricultural processing facility. The DOE Finding and Environmental Assessment established that the BioEnergy Center would have no adverse impacts with respect to sound, traffic, air quality, water quality or to threatened or endangered species. The assessment also found that no changes to land use, planning or zoning were necessary and will not result in any significant change to the existing visual quality of the site and surrounding area. As part of the extensive assessment, the DOE requested input from various entities including Federal, state, local agencies, elected officials, tribal interests, businesses, organizations and members of the general public.

The BioEnergy Center will generate eight million gallons of third-generation bioethanol each year from renewable biomass including yard, wood, agricultural and vegetative wastes. The Center will also generate six megawatts of renewable electricity. The facility will be the first to use INEOS Bio’s advanced BioEnergy technology, the world’s leading feedstock flexible technology for advanced biofuels. The technology breaks the link between food crops and ethanol production. At the heart of the INEOS Bio technology is a patented anaerobic fermentation step, through which naturally occurring bacteria convert gases derived directly from biomass into bioethanol.

Unlike other technologies that rely on one primary source of feedstock, the INEOS Bio process can produce bioenergy from numerous feedstocks, including forestry and agricultural waste, sustainable energy crops, construction waste and municipal solid waste. This flexibility allows facilities to be built anywhere that a renewable biomass feedstock is available, providing jobs and locally sourced energy for urban and rural communities. The Indian River facility is scheduled to begin construction in 4th quarter of 2010 and begin production in 2012.

bioenergy, biofuels, Ethanol, Ethanol News